LPS Installer2026-05-11T12:35:31+00:001. Pre-Installation Planning
1.1. Site Survey & Soil Resistivity
Conduct a soil resistivity test using the Wenner Four-Point Method at the intended location to determine the expected depth and number of electrodes required.
1.2. Location Selection
Moisture: Choose an area where the soil naturally retains moisture (e.g., near water pipes, shaded...